Hollins planning guide

From the Back Door to the Patio: Landing, Steps or a Raised Patio?

Published by Hollins Hardscape Project Guide · Page updated . Local-source review dates are shown below.

The gap between a back door threshold and the ground decides more about a Hollins, Virginia patio than any material choice. If the drop is a few inches, the patio can meet the door. If it is a foot or more, something has to bridge it: a landing with steps, a raised patio, or a step-down patio with a stair run. This guide explains how to measure the drop, what each option involves, and which questions to settle before a project request goes out.

What should be measured before anything is designed?

Three numbers set the design. The first is the drop: the vertical distance from the top of the door threshold to the ground or existing surface directly outside. Measure it at the door and again a few feet out, because yards slope.

The second is the fall across the patio area, meaning how much the ground drops from the house to where the far edge of the patio would be. A yard that falls 18 inches over 15 feet needs a different plan from one that is nearly flat.

The third is what is already there. A concrete stoop, a removed deck's footings, a hose bib, a dryer vent, a basement window well or a crawl-space vent near the door all affect where a landing can go and how high the finished surface can be. Photographs of these details help a provider more than a long description.

When does a landing with steps make the most sense?

A landing and steps suit most doors with a drop of more than a single riser. The landing is a small paved platform at or just below the threshold, wide enough to stand on while opening the door, and the steps carry the rest of the drop down to a patio or lawn at grade.

This arrangement keeps the main patio at ground level, where it is simpler to build and drain, and it keeps paving away from the siding except at the landing itself. It also leaves the option of turning the steps so they land where the patio wants to be rather than straight out from the door. The outdoor steps and landings page covers how the landing and steps are built and what makes them last.

When is a raised patio the better answer?

A raised patio brings the whole patio surface up to or near door height, held by a grade wall around its outer edge. It makes sense when the household wants a step-free route from the kitchen to the table, when the yard falls away sharply so a ground-level patio would sit far below the door, or when the look of a terrace with a seat-height wall is the goal.

The trade-offs are real. The wall and the fill it holds add cost, the raised surface needs a defined edge or a rail where the drop is tall, and the patio base now sits against the house above grade, which puts more pressure on drainage and on protecting the foundation. Raised patios also commonly cross the 3-foot threshold at which Roanoke County's retaining wall guide, checked October 9, 2026, requires a building permit for the wall.

What goes wrong at the threshold?

Most problems at a door-to-patio connection come from water and height. If the landing is built too high, it traps water against the siding or the door sill; if it is built flush with the threshold, melting snow and driving rain have nowhere to go. A finished surface a short step below the threshold, pitched away from the house, is the usual compromise.

Winter adds a second issue. Roanoke County's published design criteria list a 24-inch frost depth, and a landing on a shallow base can heave in January and settle in March, which is why landings attached to a house so often develop a gap at the wall. A deep, compacted base and a surface that sheds water are the main defenses.

The third issue is the stoop. A new landing built around an existing concrete stoop moves differently from the stoop, so the joint between them opens. Removing the stoop and building the landing as one unit avoids the problem.

How does this connect to the patio itself?

The threshold detail is the first decision; the patio is the second. Once the landing height and step count are fixed, the patio's finished elevation follows, and that in turn sets how much base has to be excavated and whether a grade wall is needed at the far edge. The paver and stone patios page covers the patio build, replacement decisions and the local soil and frost factors that affect it.

Local rules and sources on this page were checked on October 9, 2026. Requirements change; confirm with the responsible office before work begins.

Continue planning your Hollins project

Browse every local planning guide · Use the printable project worksheet

Hollins questions

Frequently asked questions

How much lower than the door should a landing be?

A short step down from the threshold, pitched away from the house, is typical. The exact amount depends on the door type, the sill detail and how the surface drains, and a provider should explain the number they propose rather than build flush by default.

Can a landing be built around an existing concrete stoop?

It can, but the joint between the old stoop and the new paving tends to open as the two move differently. Removing the stoop and building the landing as one piece on a single base is usually the better long-term choice.

Does a raised patio need a permit in Roanoke County?

The County's retaining wall guide, checked October 9, 2026, requires a building permit for any wall retaining 3 feet or more of unbalanced fill, and many raised patios reach that height on a sloped lot. Confirm the wall height with the building office before work begins.

Is a step-free route to the patio realistic on a sloped lot?

Often, yes, by raising the patio near the door and stepping down at the far edge instead of at the house. It costs more than a landing and steps, but it keeps the dining area level with the kitchen.

Next step

Describe your door-to-patio project

If you have a back door that opens onto a drop, describe it by text or call the project-request line and include the threshold height and photos of the door area. A reviewer may follow up to clarify the scope. Your details are shared with a provider only after that provider is named and you approve the introduction.

Call (540) 900-1551 Start text request