Hollins site conditions

Clay, steep banks and sinkholes: the ground checks to make before a Hollins hardscape project

Published by Hollins Hardscape Project Guide · Page updated . Local-source review dates are shown below.

Short answer: in Hollins, four ground conditions are worth checking before you settle on a design: shrink-swell clay, steep slopes, karst (sinkhole-prone rock), and creek floodplains. Roanoke County has published policies or map layers for each. None of them stops a patio or walk. But each one can change the base, the drainage, the wall plan, or the paperwork, so it is cheaper to know early.

First, check the county. Hollins is not a town. Roanoke County sets the rules for most of it, but a small part of the Hollins area lies in Botetourt County. If your parcel is there, ask Botetourt.

Does the County think my soil is expansive?

Roanoke County's Expansive Soils Policy, revised in February 2025, explains that shrink-swell soils are high in clay and change volume as they get wet and dry. The County maps likely areas using the USDA soil survey and a list of tax ID prefixes. In those areas, a soils test report is needed before a permit for new construction or an expansion. The policy says testing is not required for detached accessory structures.

The policy also notes that expansive soils crack walkways and driveways. That is the hardscape lesson. Even when no test is required, a patio or walk on shrink-swell clay needs:

  • a deeper, well-drained gravel base
  • the surface sloped so rain runs away from it, not into it
  • joints or a jointed surface that can move a little without breaking
  • gutters and downspouts sent away from the paved area

If you are not sure, ask the County whether your parcel is in a mapped area.

Is the yard steep enough to matter?

The County's steep slope policy applies to slopes steeper than 1 to 3, which is about 33.3%. For structures near the top or bottom of such a slope, it sets setback distances based on the slope's height, and building closer needs an engineered site study and foundation plan.

The policy is written for structures. Whether it reaches a particular wall, fire feature or other built item is a question for the County. For hardscape planning, the practical points are:

  • A slope that steep usually means cutting or filling to make a level spot, which often means a wall.
  • Walls that hold soil can need a County building permit, a plan, or a design professional as they get taller. Check the retaining walls page and the County before fixing heights.
  • A slope above the patio sends water across it. Plan a swale or drain at the top.

What is karst, and why does it matter here?

Roanoke County's Peters Creek Community Planning Area plan, which includes Hollins, lists karst topography among the area's sensitive conditions. It describes it as an underlying geology with caves and crevices that let stormwater sink in and move quickly. The County's GIS has a karst layer, but the County says it is a general guide and not proof that a sinkhole is or is not on a given lot.

For a hardscape project, the main rule is simple: do not send runoff from a new patio, roof or walk into a low spot that might be a sinkhole. If a hole opens or the ground drops during digging, stop and get qualified help rather than just filling it.

Is the lot near a creek that floods?

The Peters Creek plan reports about 477 acres in the 100-year floodplain and names creeks with repeat flood losses, including Peters Creek, Tinker Creek near Summerdean Gardens, and Carvin Creek near Hollins Gardens and Sun Valley. FEMA released preliminary new flood maps for the region in January 2026, and the County began using them for development review.

In a floodplain, filling and excavating need a permit, and the County asks owners to call 540-772-2033 before building, filling or excavating in a floodplain or near any watercourse. Regrading for a patio counts.

How big is the dig?

The County requires a land-disturbing permit when disturbance will be 2,500 square feet or more, and it counts any activity that exposes soil. A patio plus regrading plus a wall can add up. On the zoning side, the County exempts patios from the zoning permit and allows them in setback areas, though they count toward lot coverage in the R-1 district.

What to gather before you ask for a quote

  • Your parcel ID, so the County can check mapped soils, slopes, karst and flood zones
  • Photos showing slope, cracks in existing paving, and wet or low spots
  • Where gutters and downspouts drain now
  • A rough size of the area you plan to disturb
  • Any HOA or covenant rules

Local rules and sources on this page were checked on October 9, 2026. Requirements change; confirm with the responsible office before work begins.

Continue planning your Hollins project

Browse every local planning guide · Use the printable project worksheet

Hollins questions

Frequently asked questions

Will I need a soils test for a patio in Hollins?

The County's Expansive Soils Policy ties soils tests to permits for new construction or expansions in mapped areas, and says testing is not required for detached accessory structures. A plain patio usually needs no permit, but ask the County about your parcel.

How do I know if my yard has karst?

The County's GIS karst layer gives a general guide but cannot prove a sinkhole is or is not present. Watch for sudden low spots or holes, and do not send runoff into them.

Do the new flood maps affect my project?

They can. FEMA released preliminary maps in January 2026 and Roanoke County began using them for development review. Check your parcel and call the County floodplain office before regrading near a creek.

Next step

Tell us what the ground is doing

Text or call the project-request line with photos of the area, any cracks, wet spots or low places, and how steep the yard is. A reviewer may help work out which checks to ask about first, and details reach a provider only after you approve a named introduction. Or return to the home page.

Call (540) 900-1551 Start text request